What is being built in Hendon

Five schemes touch Hendon NW4. Brent Cross Town is being built and has over 1,000 residents. West Hendon is part built, for over 2,000 homes by 2031. Colindale station's new ticket hall opened in December 2025. A Hendon to Hounslow rail link is out to consultation until 18 November 2026. The Hendon Hub is on hold indefinitely.

See also: Brent Street, Hendon NW4: food, shops and parking · Church End and The Burroughs, Hendon NW4: the old village · Colindale NW9, on the edge of Hendon · Getting around Hendon

Young trees on the lawn of Claremont Park with the new blocks of Brent Cross Town and tower cranes behind.
Photo: Bellowhead678 (CC0 1.0)

Hendon NW4 is in the London Borough of Barnet. Five schemes affect it. This page says what each one is, where it is, what the council’s or the operator’s own page says and what that means for a resident.

Hendon Hub, The Burroughs

What it is. A council scheme, developed with Middlesex University, to redevelop five council-owned sites at The Burroughs, Church End, Fuller Street and the Prince of Wales estate as a civic and academic centre, with student housing, a new library and public space. Barnet’s Strategic Planning Committee approved it on 10 January 2022.

Where it stands. On hold indefinitely. The council’s news item of 10 December 2024 says it has received planning approval for the original plans, that this is a statutory notice concluding the legal process, that “none of the current proposals will be acted upon” and that any future plan would follow engagement with residents. On 10 October 2026 the council’s project page returned an access denied message and its news list had no later item naming the scheme.

What it means for you. Hendon Library stays in its building on The Burroughs with the hours in Hendon essentials. The town hall, library and campus are described in Church End and The Burroughs.

Brent Cross Town, NW2

What it is. A new neighbourhood between Brent Cross West station and the North Circular, on the far side of the A406 from Hendon. Barnet Council is delivering it with Related Argent as part of the Brent Cross Cricklewood programme, which the council calls the largest scheme in the borough. Up to 6,700 homes, up to 3 million square feet of offices, three rehoused schools and parks including Claremont Park and Clitterhouse Playing Fields.

Where it stands. Being built. The programme site, read 10 October 2026, says over 1,000 people live there after the first residential buildings of phase one. The council announced the first residents on 7 March 2025. The second phase includes a new high street. Construction of plots 22, 23 and 24 is to begin just before the end of 2026. Work began in 2020. Brent Cross West station, built for the scheme, opened on 10 December 2023.

What it means for you. Site working hours are Monday to Friday 8am to 6pm and Saturday 8am to 1pm. The Visitor Pavilion on Claremont Road is open daily 10am to 6pm and there is a community drop-in every third Thursday, 5.30pm to 6.30pm. The council also has a masterplan framework for the Western Lands between the railway and the A5, which is not a statutory plan. Trains from Brent Cross West are in Getting around Hendon.

West Hendon and Hendon Waterside, NW9

What it is. The regeneration of the West Hendon estate beside the Welsh Harp reservoir, marketed as Hendon Waterside. The council’s page says it will deliver over 2,000 mixed tenure homes by 2031, 28% of them affordable, an enhanced town centre on West Hendon Broadway, a community hub, a re-provided health centre, 2 new bridges, a pedestrian route from Hendon station through the estate and a new road layout without the Perryfield Way gyratory. It is delivered by the Barratt Metropolitan LLP, a joint venture between Barratt London and Metropolitan Housing Trust.

Where it stands. Part built. The partnership’s own site says phases 1 to 3 are complete, phase 4 was set to be complete by 2025 and phases 5 and 6 are the last 732 homes, 172 of them affordable. Its newest dated item is the summer 2023 newsletter, so the current phase is not confirmed from a dated source.

What it means for you. West Hendon is NW9, with its own council ward and its own area guide. Parking around Hendon station is in the WH zones in Parking in Hendon.

What it is. A proposed London Overground service from Hendon to Hounslow on existing freight lines. TfL’s consultation page says it would use new platforms on the freight lines at Hendon and new dedicated platforms at Brent Cross West, with four new stations at Neasden, Harlesden, Old Oak Common Lane and Lionel Road and four to six trains an hour. Barnet Post reported it on 29 September 2026; TfL’s own page is the source for everything here.

Where it stands. Out to consultation from 23 September to 18 November 2026. TfL says that at the end of 2027 it will decide whether to prepare an application for powers, that construction could begin in the early 2030s and that the service could start by 2035. It is not approved or funded for construction.

What it means for you. Nothing changes at Hendon station yet. You can respond by TfL’s survey, by email, by post to FREEPOST TFL HAVE YOUR SAY or by its call back service on 020 3054 6037.

Colindale station rebuild, NW9

What it is. TfL’s rebuilding of Colindale Underground station, one stop north of Hendon Central, with a new ticket hall and a lift from street to platform in place of the 1960s entrance. The station closed from June 2024 for six months and reopened on 20 December 2024 with new staircases.

Where it stands. The new ticket hall opened on 22 December 2025. TfL called Colindale the 94th step-free Tube station and said the upgrade would be fully complete by mid-2026, with an accessible toilet, permanent signage, cycle parking and a retail unit still to come and the old ticket hall to be demolished. On 10 October 2026 TfL’s station page reported no step-free access because of a faulty lift.

What it means for you. Colindale is the stop for the RAF Museum and for two of Middlesex University’s halls. Check TfL’s Colindale page for the lift before relying on it. See the Colindale guide.

Your own building work

If your own plans have hit trouble, see planning refused: what now? and the builder walked off site. Who we list for building work is under builders and architects. New places opening as a result of all this are logged in new in Hendon.

Questions people ask

Is the Hendon Hub going ahead?
No. Barnet Council said on 10 December 2024 that it had received planning approval for the original plans and had put the scheme on hold indefinitely. It said none of the proposals would be acted upon and any future plan would follow engagement with residents. On 10 October 2026 the council's project page was not publicly accessible.
What is Brent Cross Town?
A new neighbourhood between Brent Cross West station and the North Circular, in NW2. Barnet Council is delivering it with Related Argent. The programme site says over 1,000 people live there after phase one, with up to 6,700 homes and up to 3 million square feet of offices planned. Work began in 2020.
Is Hendon getting a new train line?
It is proposed, not approved. TfL is consulting until 18 November 2026 on the West London Orbital, a Hounslow to Hendon service on existing freight lines with new platforms at Hendon and Brent Cross West. TfL says it will decide at the end of 2027 whether to seek powers, that construction could begin in the early 2030s and that services could start by 2035.
Is Colindale station finished?
The new ticket hall with a lift opened on 22 December 2025. TfL said the upgrade would be fully complete by mid-2026, including an accessible toilet, signage and cycle parking. It said the old ticket hall would be demolished. On 10 October 2026 TfL's station page reported no step-free access because of a faulty lift.
What is Hendon Waterside?
The new name for the West Hendon estate regeneration beside the Welsh Harp. Barnet Council says it will deliver over 2,000 homes by 2031, 28% of them affordable, with a community hub, a health centre and two new bridges. It is built by the Barratt Metropolitan joint venture of Barratt London and Metropolitan Housing Trust.